How to save energy in injection moulding machine?
RedsAnt insulation jackets provide a low-cost solution for reducing energy costs, and shortening start-up time between jobs by retaining heat inside barrels heater. This will save the energy for the injection moulding machine and lower the ambient temperature in your facility, and lower the energy cost for equipment operations and air conditioning.
Energy Saving Case of Injection Moulding Machine
Model: JSW JT150RE
1. Testing Data: | |||||
1.1 Energy saving data | |||||
1.1.1 Without the insulation cover | |||||
Machine | test times | test duration | coil power consumption | ||
JT150RE | 1 | 30 minutes | 1.4771KWH | ||
1.1.2 After installing the insulation covers | |||||
Machine | test times | test duration | coil power consumption | ||
JT150RE | 1 | 30 minutes | 0.857KWH | ||
1.2 Energy saving result | |||||
energy saving (one hour) | energy saving ratio | daily energy saving | monthly energy saving | yearly energy saving | |
1.24KWH | 42% | 29.76KWH | 773KWH | 9,286KWH | |
cost per KWH | daily cost saving | monthly cost saving | yearly cost saving | ||
RMB 0.8 | RMB 23.8 | RMB 619 | RMB 7429 |
2. Testing photos
30 minutes power consumption 30 minutes power consumption
(without the insulation cover) (after installing the insulation covers)
For more about energy saving for injection moulding machine, please get the details on our webpage.
Energy saving for plastic extruder machine https://www.redsant.com/Energy-Saving-for-Plastic-Extruder-Machine-id3557170.html
Energy saving method for plastic injection moulding machine https://www.redsant.com/Energy-saving-method-for-plastic-injection-moulding-machine-id3058840.html
How to improve your injection workshop? https://www.redsant.com/How-to-improve-your-injection-workshop-id3887630.html
Workshop Improvement Case https://www.redsant.com/Workshop-Improvement-Case-id3723111.html